Showing posts with label Synoptic. Show all posts
Showing posts with label Synoptic. Show all posts

Wednesday, 21 March 2018

Starting the visual effects on the lab

Today i have started on the lab scene which i am going to matt paint and do some coloring
and masking to make some adjustments to the scene when needed.
My the first part i wanted to track an image to the scene however they is some issues with the footage
which is making tracking difficulty i have attempted to use different methods and various fixes with
no results. After speaking to my group and a lecture we have decided than the issues with the
footage are harder to solve that we expected and we are planning on rerecording the footage
with a tripod and some other changes to offset potential issues which could cause the tracking
problems.








(on the image shown the tracking lines should be more compact and within the square)
Otherwise i have been working on stuff with other members to assist until new footage is available.
As well as that i have been doing some of the other work that the project needs such as posters
and updating document


The group is all involved and make the collective decision to re-record the footage
as it would likely be faster to do so that fixing the old one would be. Having the whole group able to
provide assistance is useful as everyone is familiar with after effects and the software we use to provide
troubleshooting and then decided when it’s not worth fixing and restarting.

Monday, 19 March 2018

Beginning Production

We have produced a title sequence to go at the start of the project this has our names and a mixture of stock footage to create an opening scene this is something that we all had some creative direction on to help put it together. We wanted to have some of the text move to give it more life however in the end we decided against it as we wanted all text to be either still or moving for constancey.




As a team we all have our own jobs to do but we regularly discuss and look over each others work to
see how we can improve and share creative input. Everyone is filling their roles and working well together
to provide feedback to each other to see what we can all do to improve.


Overall we are on track for the project with just a small bit of footage left to get to finish off while other
members have begun working on the visual effects already for the project.  

Friday, 9 March 2018

Synoptic project Filming Oxclose

We met up in Oxclose so we could film a lot of the outside sections of the project we got a large amount of the footage we needed done with behind the scenes as well. We had 3 of us their i was holding and using the camera while charlie and Jake were acting in some of the shots. To steady the camera we just had to use what we could as we didn't have a tripod so a mixture of balancing against a fence and a tree stump were used to steady the camera when needed. We are all confident the footage is good and we won't need to rerecord any of it at all.

We might have had a few issue with consistency of lighting but this will be fixable with some colour correcting in after effects.

Tuesday, 6 March 2018

Synoptic Project Filming the News

Today we have begun the first of the filming for the Before the after. We filmed the news scene which is the only part which requires a script (Prepared beforehand)  we took some time to get the tripod and camera set up to get the angle and lighting right for the shoot. We did run into the issue of having low battery and not knowing when it might ruin out meant we had to keep the camera turned off whenever it wasn't filming and had to work quickly around it. We were working with someone else who was outside the group so they had to learn the script taking up some time but after that, we were able to capture the footage. We got the footage we needed as well as some for behind the scenes.

Monday, 5 March 2018

Synoptic project progress 5th of march

We have completed preproduction and we were expecting to start recording the footage last week however due to the weather conditions we had to suspend filming which we are now hoping to get started this week.
Otherwise the group is working well and what we can do is coming together to a high standard for the planning, once we have some footage we can begin doing the proper work. We did want to start recording earlier however we can't control the snow and once it's past we should be on track.

Monday, 26 February 2018

Synoptic Project pre production

Our Current status of the synoptic project preproduction is mostly finished we just need to get the Rec done with requires use to go to all the filming locations and take photos of where we are going. All of our other PreProduction has been completed and signed off on so we can start our main production soon.



We have also Made some graphics for a Warning Alert to show on the TV news report. Other Pre visual work has been done to get an more concrete idea of what we want the style to be for the final product. The Trello has also being redesigned and organised to make it clearer and to include more. This is for the news segment to make it feel more like a real news show. To make this we got the logos for the British government, home office and ministry of defense and we added the Text in Big block capitals to make it more important looking.





We also made a graphic for the news segment to go before it before the camera goes on to produce this we got the image and used Photoshop to separate the parts and then made the circles on the image spin to make it feel like it being more active. To finish it off we added some noise to it to make it seem like it was more "TV like" as the fuzziness adds to the effect


Tuesday, 6 February 2018

Before the after synoptic project preplanning

My group has completed all the preplanning for the synoptic that we can do at the moment we have got the jobs assigned which are able to be moved around freely however, should we require it. All the other parts are ready and organized we also have a trello to keep useful information and keep other updated on our current progress in the project. I am confident that we have as much prepared as we need. The group work is all fine and everyone is working together to get the preplanning done we are hoeping to start recording within the first few weeks after half term which is around Feb 19th

Tuesday, 30 January 2018

Synoptic project Before the after Getting started

I moved Groups to join with a VFX team to work on their VFX project before the after which is a pre-apocalyptic short film where a meteor is going to strike earth signaling the end of the world. I have met with my new group and we have discussed the project and began putting together the preplanning such as the assert list and production schedule.

Our frist priority is too finish the script and storyboard as we need them to be able to finalize the planning so we can put the rest of preplanning together. This will give us a concreat idea of what we need to do.