Tuesday 27 March 2018

27th march update

At the start of the day we did our scrum and distributed our jobs among us for us to do over the
Easter break so everyone knew what they were doing i was assigned to continue working on my
footage and see if i can get the footage fixed with the tracking issue using other plugins such as mocha.
We have been collaborating every so often to see each other's work and provide feedback.
The rest of the group is all working effectively and getting everything done on the timeline that we
expect. We should have 4 completed bits of footage ready for the MVP provided we run into no issue.
It’s likely if i can’t get the footage fixed we are going to just re-record it with a tripod to make the camera
perfectly still to eliminate some barriers to what could stop us with the tracking.


The group as a whole is happy with our progress apart from the issues with the tracking which has
caused us to take longer than expected but we should still remain on track.